Monday, 25 April 2011

Work update


This is what work looks like now. In the front are the three (actually
2.5) crankcases of the big engines, my little engine will go in front
of the yellow drum on the right.
Behind the engines are the insulated steam pipes, the main steam line
is the horizontal one on the right. The black box behind the engines
to the left of the steam pipes is a condenser to condense the steam
after it comes out of the engines, this increases the efficiency of
the system.
The large white burrito at the back is our insulated hot water storage
tank which is a LPG tank with different pipes sticking out of it.

No comments: